{"id":16455,"date":"2024-09-06T10:08:52","date_gmt":"2024-09-06T08:08:52","guid":{"rendered":"https:\/\/ifd.al\/?p=16455"},"modified":"2024-09-19T16:03:30","modified_gmt":"2024-09-19T14:03:30","slug":"electricity-the-installation-of-smart-meters-begins","status":"publish","type":"post","link":"https:\/\/ifd.al\/en\/electricity-the-installation-of-smart-meters-begins\/","title":{"rendered":"Electricity, the installation of smart meters begins"},"content":{"rendered":"<p>1622 smart electricity meters will be installed in 4 regions of the country. After the tender with a limited fund of 120 million lek developed at the end of last year, the Distribution System Operator has concluded the contract that paves the way for investment, while according to OSHEE the benefits will be two-way, both for the company and for subscribers.<\/p>\n<p>This is because the smart meter realizes correct and high-quality consumption billing, as well as follows in real time the flow of kilowatts in the electricity network. Meanwhile, consumers can check consumption progress and billing in real time. Problems that may arise from any defect are identified and quickly resolved.<\/p>\n<p>The new meters will be installed in the electric cabins and to the subscribers of the regions: Durr\u00ebs, Shkod\u00ebr, Lezh\u00eb and Vlor\u00eb. The first meters were placed in the area of \u200b\u200bKashari and Vora, an important part of the Tirana region, where many businesses are concentrated.<\/p>\n<p>After the installation of 3500 smart meters in these two areas, the reduction in the level of losses resulted in 7.5%, which is the required standard. Meanwhile, this paved the way for the implementation of the strategic plan for investments in measurement systems through the use of innovative technology.<\/p>\n<p>&nbsp;<\/p>\n<p>Source: Rtsh<\/p>\n","protected":false},"excerpt":{"rendered":"<p>1622 smart electricity meters will be installed in 4 regions of the country. After the tender with a limited fund of 120 million lek developed at the end of last year, the Distribution System Operator has concluded the contract that paves the way for investment, while according to OSHEE the benefits will be two-way, both [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":16751,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"inline_featured_image":false,"_monsterinsights_skip_tracking":false,"_monsterinsights_sitenote_active":false,"_monsterinsights_sitenote_note":"","_monsterinsights_sitenote_category":0,"_uf_show_specific_survey":0,"_uf_disable_surveys":false,"footnotes":""},"categories":[100],"tags":[116],"class_list":["post-16455","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-electrical-installations","tag-electrical-installations"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.3 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Electricity, the installation of smart meters begins - IFD Tech<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/ifd.al\/en\/electricity-the-installation-of-smart-meters-begins\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Electricity, the installation of smart meters begins - IFD Tech\" \/>\n<meta property=\"og:description\" content=\"1622 smart electricity meters will be installed in 4 regions of the country. After the tender with a limited fund of 120 million lek developed at the end of last year, the Distribution System Operator has concluded the contract that paves the way for investment, while according to OSHEE the benefits will be two-way, both [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/ifd.al\/en\/electricity-the-installation-of-smart-meters-begins\/\" \/>\n<meta property=\"og:site_name\" content=\"IFD Tech\" \/>\n<meta property=\"article:published_time\" content=\"2024-09-06T08:08:52+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2024-09-19T14:03:30+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/ifd.al\/wp-content\/uploads\/2024\/09\/Ifd-artikul-mates-elektrik.png\" \/>\n\t<meta property=\"og:image:width\" content=\"400\" \/>\n\t<meta property=\"og:image:height\" content=\"212\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"IFD\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"IFD\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/ifd.al\\\/en\\\/electricity-the-installation-of-smart-meters-begins\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/ifd.al\\\/en\\\/electricity-the-installation-of-smart-meters-begins\\\/\"},\"author\":{\"name\":\"IFD\",\"@id\":\"https:\\\/\\\/ifd.al\\\/en\\\/#\\\/schema\\\/person\\\/0da0a70d40deb3222f591301f08cd28f\"},\"headline\":\"Electricity, the installation of smart meters begins\",\"datePublished\":\"2024-09-06T08:08:52+00:00\",\"dateModified\":\"2024-09-19T14:03:30+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/ifd.al\\\/en\\\/electricity-the-installation-of-smart-meters-begins\\\/\"},\"wordCount\":213,\"publisher\":{\"@id\":\"https:\\\/\\\/ifd.al\\\/en\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/ifd.al\\\/en\\\/electricity-the-installation-of-smart-meters-begins\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/ifd.al\\\/wp-content\\\/uploads\\\/2024\\\/09\\\/Ifd-artikul-mates-elektrik.png\",\"keywords\":[\"Electrical installations\"],\"articleSection\":[\"Electrical installations\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/ifd.al\\\/en\\\/electricity-the-installation-of-smart-meters-begins\\\/\",\"url\":\"https:\\\/\\\/ifd.al\\\/en\\\/electricity-the-installation-of-smart-meters-begins\\\/\",\"name\":\"Electricity, the installation of smart meters begins - IFD Tech\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/ifd.al\\\/en\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/ifd.al\\\/en\\\/electricity-the-installation-of-smart-meters-begins\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/ifd.al\\\/en\\\/electricity-the-installation-of-smart-meters-begins\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/ifd.al\\\/wp-content\\\/uploads\\\/2024\\\/09\\\/Ifd-artikul-mates-elektrik.png\",\"datePublished\":\"2024-09-06T08:08:52+00:00\",\"dateModified\":\"2024-09-19T14:03:30+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/ifd.al\\\/en\\\/electricity-the-installation-of-smart-meters-begins\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/ifd.al\\\/en\\\/electricity-the-installation-of-smart-meters-begins\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/ifd.al\\\/en\\\/electricity-the-installation-of-smart-meters-begins\\\/#primaryimage\",\"url\":\"https:\\\/\\\/ifd.al\\\/wp-content\\\/uploads\\\/2024\\\/09\\\/Ifd-artikul-mates-elektrik.png\",\"contentUrl\":\"https:\\\/\\\/ifd.al\\\/wp-content\\\/uploads\\\/2024\\\/09\\\/Ifd-artikul-mates-elektrik.png\",\"width\":400,\"height\":212},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/ifd.al\\\/en\\\/electricity-the-installation-of-smart-meters-begins\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/ifd.al\\\/en\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Electricity, the installation of smart meters begins\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/ifd.al\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/ifd.al\\\/en\\\/\",\"name\":\"IFD Tech\",\"description\":\"Panele Fotovoltaike \\\/ Sh\u00ebrbime Telekomunikaconi\",\"publisher\":{\"@id\":\"https:\\\/\\\/ifd.al\\\/en\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/ifd.al\\\/en\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/ifd.al\\\/en\\\/#organization\",\"name\":\"IFD Tech\",\"url\":\"https:\\\/\\\/ifd.al\\\/en\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/ifd.al\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/ifd.al\\\/wp-content\\\/uploads\\\/2022\\\/04\\\/logo-2.png\",\"contentUrl\":\"https:\\\/\\\/ifd.al\\\/wp-content\\\/uploads\\\/2022\\\/04\\\/logo-2.png\",\"width\":380,\"height\":106,\"caption\":\"IFD Tech\"},\"image\":{\"@id\":\"https:\\\/\\\/ifd.al\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/ifd.al\\\/en\\\/#\\\/schema\\\/person\\\/0da0a70d40deb3222f591301f08cd28f\",\"name\":\"IFD\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/95c6b0b57ce225c546f2a36e44ce74d16c24c1881908cd364e31bf787bd8b76c?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/95c6b0b57ce225c546f2a36e44ce74d16c24c1881908cd364e31bf787bd8b76c?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/95c6b0b57ce225c546f2a36e44ce74d16c24c1881908cd364e31bf787bd8b76c?s=96&d=mm&r=g\",\"caption\":\"IFD\"},\"sameAs\":[\"https:\\\/\\\/ifd.al\"],\"url\":\"https:\\\/\\\/ifd.al\\\/en\\\/author\\\/admin_sq158zjq\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Electricity, the installation of smart meters begins - IFD Tech","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/ifd.al\/en\/electricity-the-installation-of-smart-meters-begins\/","og_locale":"en_US","og_type":"article","og_title":"Electricity, the installation of smart meters begins - IFD Tech","og_description":"1622 smart electricity meters will be installed in 4 regions of the country. After the tender with a limited fund of 120 million lek developed at the end of last year, the Distribution System Operator has concluded the contract that paves the way for investment, while according to OSHEE the benefits will be two-way, both [&hellip;]","og_url":"https:\/\/ifd.al\/en\/electricity-the-installation-of-smart-meters-begins\/","og_site_name":"IFD Tech","article_published_time":"2024-09-06T08:08:52+00:00","article_modified_time":"2024-09-19T14:03:30+00:00","og_image":[{"width":400,"height":212,"url":"https:\/\/ifd.al\/wp-content\/uploads\/2024\/09\/Ifd-artikul-mates-elektrik.png","type":"image\/png"}],"author":"IFD","twitter_card":"summary_large_image","twitter_misc":{"Written by":"IFD","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/ifd.al\/en\/electricity-the-installation-of-smart-meters-begins\/#article","isPartOf":{"@id":"https:\/\/ifd.al\/en\/electricity-the-installation-of-smart-meters-begins\/"},"author":{"name":"IFD","@id":"https:\/\/ifd.al\/en\/#\/schema\/person\/0da0a70d40deb3222f591301f08cd28f"},"headline":"Electricity, the installation of smart meters begins","datePublished":"2024-09-06T08:08:52+00:00","dateModified":"2024-09-19T14:03:30+00:00","mainEntityOfPage":{"@id":"https:\/\/ifd.al\/en\/electricity-the-installation-of-smart-meters-begins\/"},"wordCount":213,"publisher":{"@id":"https:\/\/ifd.al\/en\/#organization"},"image":{"@id":"https:\/\/ifd.al\/en\/electricity-the-installation-of-smart-meters-begins\/#primaryimage"},"thumbnailUrl":"https:\/\/ifd.al\/wp-content\/uploads\/2024\/09\/Ifd-artikul-mates-elektrik.png","keywords":["Electrical installations"],"articleSection":["Electrical installations"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/ifd.al\/en\/electricity-the-installation-of-smart-meters-begins\/","url":"https:\/\/ifd.al\/en\/electricity-the-installation-of-smart-meters-begins\/","name":"Electricity, the installation of smart meters begins - IFD Tech","isPartOf":{"@id":"https:\/\/ifd.al\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/ifd.al\/en\/electricity-the-installation-of-smart-meters-begins\/#primaryimage"},"image":{"@id":"https:\/\/ifd.al\/en\/electricity-the-installation-of-smart-meters-begins\/#primaryimage"},"thumbnailUrl":"https:\/\/ifd.al\/wp-content\/uploads\/2024\/09\/Ifd-artikul-mates-elektrik.png","datePublished":"2024-09-06T08:08:52+00:00","dateModified":"2024-09-19T14:03:30+00:00","breadcrumb":{"@id":"https:\/\/ifd.al\/en\/electricity-the-installation-of-smart-meters-begins\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/ifd.al\/en\/electricity-the-installation-of-smart-meters-begins\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/ifd.al\/en\/electricity-the-installation-of-smart-meters-begins\/#primaryimage","url":"https:\/\/ifd.al\/wp-content\/uploads\/2024\/09\/Ifd-artikul-mates-elektrik.png","contentUrl":"https:\/\/ifd.al\/wp-content\/uploads\/2024\/09\/Ifd-artikul-mates-elektrik.png","width":400,"height":212},{"@type":"BreadcrumbList","@id":"https:\/\/ifd.al\/en\/electricity-the-installation-of-smart-meters-begins\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/ifd.al\/en\/"},{"@type":"ListItem","position":2,"name":"Electricity, the installation of smart meters begins"}]},{"@type":"WebSite","@id":"https:\/\/ifd.al\/en\/#website","url":"https:\/\/ifd.al\/en\/","name":"IFD Tech","description":"Panele Fotovoltaike \/ Sh\u00ebrbime Telekomunikaconi","publisher":{"@id":"https:\/\/ifd.al\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/ifd.al\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/ifd.al\/en\/#organization","name":"IFD Tech","url":"https:\/\/ifd.al\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/ifd.al\/en\/#\/schema\/logo\/image\/","url":"https:\/\/ifd.al\/wp-content\/uploads\/2022\/04\/logo-2.png","contentUrl":"https:\/\/ifd.al\/wp-content\/uploads\/2022\/04\/logo-2.png","width":380,"height":106,"caption":"IFD Tech"},"image":{"@id":"https:\/\/ifd.al\/en\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/ifd.al\/en\/#\/schema\/person\/0da0a70d40deb3222f591301f08cd28f","name":"IFD","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/95c6b0b57ce225c546f2a36e44ce74d16c24c1881908cd364e31bf787bd8b76c?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/95c6b0b57ce225c546f2a36e44ce74d16c24c1881908cd364e31bf787bd8b76c?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/95c6b0b57ce225c546f2a36e44ce74d16c24c1881908cd364e31bf787bd8b76c?s=96&d=mm&r=g","caption":"IFD"},"sameAs":["https:\/\/ifd.al"],"url":"https:\/\/ifd.al\/en\/author\/admin_sq158zjq\/"}]}},"_links":{"self":[{"href":"https:\/\/ifd.al\/en\/wp-json\/wp\/v2\/posts\/16455","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/ifd.al\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/ifd.al\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/ifd.al\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/ifd.al\/en\/wp-json\/wp\/v2\/comments?post=16455"}],"version-history":[{"count":4,"href":"https:\/\/ifd.al\/en\/wp-json\/wp\/v2\/posts\/16455\/revisions"}],"predecessor-version":[{"id":16638,"href":"https:\/\/ifd.al\/en\/wp-json\/wp\/v2\/posts\/16455\/revisions\/16638"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/ifd.al\/en\/wp-json\/wp\/v2\/media\/16751"}],"wp:attachment":[{"href":"https:\/\/ifd.al\/en\/wp-json\/wp\/v2\/media?parent=16455"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/ifd.al\/en\/wp-json\/wp\/v2\/categories?post=16455"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/ifd.al\/en\/wp-json\/wp\/v2\/tags?post=16455"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}